TrailsSaturday, November 21
The Swamp Rabbit Trail's new Verdae bridge is open, and Mauldin is the plan
The 5AM Mauldin team
If you walk, run or bike the Swamp Rabbit Trail, the Green Line just got smoother. Greenville opened a 1,180-foot pedestrian bridge over Verdae Boulevard on Thu., Nov. 19. It replaces a signalized crossing the city added as a stopgap, and it's meant to make the trail safer to use.
The state and city paid for nearly all of the Verdae bridge
Source: Here Greer
View as table
| Value | |
|---|---|
| State | $2.25 million |
| City of Greenville | $2.37 million |
| Upstate Greenways and Trails Alliance | $0.1 million |
The city and county finished the extension from Verdae to Millennium Boulevard past Interstate 85. The city built a $4.7 million bridge, and the county paved 0.7 miles of trail and built a bridge over Laurel Creek. From CU-ICAR, the trail is within about a mile of Mauldin's city limits.
- Next leg: a segment to Innovation Drive, still being designed
- Long-term plan: connect to Mauldin and the rest of the Golden Strip
- Mayor Knox White on the handoff: "We hand them the baton"
The Verdae bridge and the trail it serves, by the numbers
- 1,180 feet
- long, the new bridge over Verdae Boulevard
- 1,000
- average daily users on the Green Line
- 15,000
- vehicles on Verdae Boulevard daily
- 0.7 miles
- of link toward Millennium Boulevard
Sources: Post and Courier, Here Greer
Sources: Post and Courier, Here Greer, FOX Carolina News